Railpro Dust Reduction

 

Railpro has developed an innovative dust suppressing ballast train which effectively minimises workers exposure to hazardous ballast dust.

 

The train is comprised of 36 wagons divided into nine sets of four. Each wagon is fitted with a hydraulic unloading and high-pressure water spraying system which suppresses dust particles with a water mist sprayed over the ballast as it leaves the wagon.

 

Each set of four wagons has its own operating computer, lighting, remote control, water reservoir and power pack (diesel engine, electro-hydraulic motor and high pressure pump).

 

Operation is by remote control which makes unloading simple and practically effortless. The operator does not have to step on and off the wagon at any time, reducing the danger of tripping or falling onto the adjacent track. The wagons unload the ballast, without damaging the rails via a shutter with less effort and more accuracy.

 

The Railpro dust suppression system significantly improves the working conditions for rail track maintenance workers by eliminating the problems associated with inhaling ballast dust.

Dust Reduction Enquiry Form

Submitting Form...

The server encountered an error.

Form received.

HIRD Rail Development is a

division of the HIRD Group

HIRD Rail Development

 

Clifford House

Lady Bank Drive

Lakeside

Doncaster DN4 5NF

 

P:  +44 (0)1302 952040

E:  info@hirdrail.com

 

 

HIRD Rail Development

 

Cold Hole Expansion (CBX)

FTI RailTec

FTI StopCrackEX

Railpro

Lankhorst Mouldings

Trough-Tec Systems

 

Green Trough

Walkway System

Elevated System

Replacement Composite Lid

HIRD Rail Services

 

Insulated Rail Joints

Track Products

Heritage Rail Services